Dude, where’s our wall?
Written by julio on October 9th, 2004
Framing in progress for the new patio door. The wall had to be rebuilt where the old window was on the left side. The continous 12″ header that was put in during the last remodel made this job as easy as it could be.
Posted in Kitchen | Tags: framing
You can skip to the end and leave a response. Pinging is currently not allowed.