Hallway

...now browsing by category

 

Back in the closet

Friday, December 4th, 2009

I got the  bug to pick back up where we left off on the downstairs hall closet (abandoned stairwell).  Back in 2007, we started converting the steps into proper shelves, but we’ve done nothing but pile more crap into the closet since then.  Over the last week, I finally brought some power (including a light) and some network cables for our wireless router into the formerly uncivilized space.  I’ve been wanting to move the router to the ground floor for a long time, because it performed pretty poorly in the basement utility room, being blocked by the ductwork and the furnace.

While I was at it, I relocated our phone’s base station here, too, since it suffered from the same problems as the wi-fi.  Both are working much better than they were before.  And if you’re wondering why I did such an overkill, industrial job with the electric conduit, it’s because I scavenged about 200′ of conduit and dozens of handy boxes when my company’s office was being remodeled a few years ago.  The contractor was going to send it all of for scrap, so I grabbed as much of it as I could.  It’s been taking up space in the garage for over 3 years, so I get all excited any chance I get to pull out the conduit bender and actually get to use some of it!

Conduit and cat5, oh my!

Conduit and cat5, oh my!

Taking the easy way out…

Sunday, July 27th, 2008

As anyone who has ever remodeled a house knows, sometimes “easy” just means easier than the alternative. Easy also may mean that you are cutting corners or hiring someone else to do the work. In this case, we’re doing both!

We have long questioned how far we wanted to go on this back bedroom, which was formerly Chloe’s room and is now destined to become our family room. The plaster is cracked in quite a few places, although to some extent that’s been mitigated by the multiple layers of wallpaper. On our ambitious days, we’ve talked about stripping off the wallpaper and repairing the plaster. In our more lazy moments, we’ve contemplated doing nothing and just moving a couch our TV into the room. But, as we’ve gotten really tired of shuffling things around our house as projects move from one area to the next, we did commit to not “temporarily” start using this room, a phrase that for us usually equates to at least two years before we fix it up.

Our compromise in this case was to remove all the trim, so that we can have someone (not us!) come in and install 1/4″ drywall over all the walls. While the plaster purists out there will be appalled, we just don’t have the time or patience right now to strip off all the wallpaper and fix up the plaster. I spent about 3 hours removing all the trim today as the first phase of this project, and tomorrow I’m going to call to get a quote on the drywall work. The salvageable trim will go to Houck’s for stripping, and we will install new base trim. One of the previous renters had a dog that did an amazing amount of damage to the base trim, so it was shot. We will probably take the picture rail to the Rebuilding Center, because I’d rather go with crown, and there is no other picture rail in the entire house. Anyway, once get the walls “restored,” we’ll refinish our stripped trim and replace the trim that wasn’t salvageable. And between getting a quote and actually getting the drywall up, I am going to rough in some wiring for the TV. Our goal is to have this room finished by the time Stephanie starts teaching again in late September.

And just now Stephanie asked me while cutting some vegetables in the kitchen whether “the final nail was in the coffin?” on the patio door idea. That was something we had tossed around for awhile…”wouldn’t it be nice if we replaced the back window with a door out the the patio?” This idea has long been stretched between our desire to streamline our projects and our bad habit of coming up with bright ideas. Keep posted to see which philosophy wins…

jib_3621.JPG