New bathroom framing

Part of our upstairs plan was to add a 1/2 bath, since it would make things much easier for everyone in the house.  To do this, we removed the original bedroom wall, moved it further back and built a new wall that integrated with the existing wall of the main room.  Nothing has been plumbed yet, but the plan is to run the pipes up through the unused stairwell in the back of the house.

upstairs15_2upstairs17

 

Upstairs15_2

Upstairs17

Advertisements

2 thoughts on “New bathroom framing

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s