More structure

Another baby step, but that’s more than I usually accomplish on a weeknight.  Last night Chloe was all pumped about “working on the playhouse,” so I agreed to head outside with her and Ginger.  I managed to add in the final piece of the perimeter structure…the 4×6 pressure treated beam that we dug out of the yard back in 2005.  If you look closely in this post, you can see the 4×6 terracing the side yard before we regraded it.   The hunk of wood is now acting as the rear joist in their playhouse.

Inching closer
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s